Work order report
RH-0418
Before and after2
Before 1:17 pm
After 2:01 pmUnder the sink
Before 1:18 pm
After 2:02 pmCabinet floor
Reported
Water under the kitchen sink. The resident closed the valve under the sink while we were on the text, and the leak stopped.
Found
The slip joint on the P trap had cracked. Water had pooled on the cabinet floor. The subfloor was dry.
Done
Replaced the P trap and both slip joint washers. Dried the cabinet. Ran the water for five minutes and checked for leaks.
Parts
- PVC P trap, 1 1/2 inch, 1
- Slip joint washers, 2
Sign off3
The resident confirmed the leak had stopped, 2:05 pm.
Warranty4
Plumbing, 60 days from completion. Ends 5 December 2026.
Timeline
- Request received by text
- Resident closed the valve, leak stopped
- Within the manager's standing approval limit, quote sent as a notice
- Visit agreed with the resident for 1 to 3 pm
- Plumber on site, before photos taken
- After photos in, resident signed off
- Report sent, invoice sent carrying PO 2231
